Energy Rehabilitation
The perfect solution for your community of residents: more thermal comfort, more savings and with renewable energy.
-
We design a tailor-made solution for all the residents: no noise and no nuisance
-
We manage the available subsidies And we advance the pre-awarded grant!
-
You will increase the value of your home by 20% to 30%
Contact us
We will answer all your questions and help you find the perfect solution for your community.
Discover the advantages of this comprehensive solution
Your home will consume much less energy, this way taking care of the planet and your wallet.
With a more efficient home, reduce your energy bills - and save!
Achieve greater thermal comfort, while using less energy
Increase the value of your home by 20%-30%
Say goodbye to gas! And minimise your electricity consumption
Reduce your CO2 emissions, go for renewable energy
Improve your energy rating
What does it include?
Why with Iberdrola?
We help you to bring your community of residents to its best version.
Contact us
We will answer all your questions and help you find the perfect solution for your community.
We take care of the managing the subsidy
As a rehabilitation agent, we advise you, process the grant and advance the subsidy once it has been granted.
Tax deduction for energy rehabilitation works
-60%
-18.800 €
Maximum grant (per home) from NextGeneration funds *
The amount of the subsidies is exempt from taxation
+0 %
-18.800 €
Maximum grant (per home) from NextGeneration funds *
-60%
Tax deduction for energy rehabilitation works
+0 %
The amount of the subsidies is exempt from taxation
*The limit of the subsidies to be applied for is €18,800 per home or 80% of the total amount of the property. Subject to the availability of funds in each of the autonomous communities.
How much could it cost me?
Each community of residents is unique and requires a customised study. Contact us and start saving!
Example of refurbishment in a building built in 1976
Price per home (incl. VAT)
23.262€
With NextGeneration grant
Price per home from*
47€/month
in 10 years (€4,400 in total)
Actions needed to use more than 60% renewable energy:
For a building with a flat roof and a central gas boiler for heating and DHW
- External insulation with SATE system
- Roof insulation
- Thermal installation of the building. Aerothermal heat pump for both heating and DHW
- Solar installation for electricity production using photovoltaic panels
Example of rehabilitation in the 1976 building.
Budget simulation for a building of 118 homes, built in 1976 in the community of Madrid.
With NextGeneration grant
Amount to be paid by the association*
578.917€
Actions needed to use more than 60% renewable energy:
In a building with a flat roof and a collective gas boiler for heating and hot water.
- External insulation with SATE system
- Roof insulation
- Thermal installation of the building. Aerothermal heat pump for both heating and DHW
- Solar installation for electricity production using photovoltaic panels
*Examples of an indicative quotation for a building with 118 homes, built in 1976 in the Community of Madrid. Includes: VAT (21%). Instead of VAT, IGIC (7%) will be applied in the Canary Islands and IPSI (1%) will be applied in Ceuta and Melilla. Subject to the availability of funds in each of the autonomous communities. If your home does not match these parameters, contact us without obligation for a customised study for your home.
Any questions?
Here are some of the most frequently asked questions
¿Qué es?
Benefits such as elimination of dependence on fossil fuels, a 100% electric solution, energy savings from day one, improved thermal comfort and total self-consumption.
Yes, property appreciation is estimated to increase by 25% after energy rehabilitation.
Subsidy and payment
Generally three months from application, although it can take up to five months.
No. If the Administration grants a lower subsidy percentage than the one specified in the offer, Iberdrola must inform the CCPP, offering the CCPP the possibility to stop or continue with the Rehabilitation. Should the CCPP wish to proceed, it will do so under the new parameters of the subsidy awarded; otherwise, the commitment is considered to be terminated without incurring any costs for the CCPP.
No. If, once the work has been carried out, the Administration informs Iberdrola that the work does not comply with the project drawn up and therefore does not recognise the percentage of the grant initially awarded, Iberdrola assumes the difference. In other words, the CCPP will not be affected by this variation in the amount finally paid.
Yes, we collaborate with most financial institutions and would make available to the CCPP the one that best fits their requirements.
If, once the project is completed, the project shows that the initial quotation deviates by more than the 10% reflected in the offer, Iberdrola will not pass on the cost, offering the CCPP the possibility to stop or continue with the rehabilitation. If it wishes to proceed, the CCPP will pay the new adjusted financial proposal.
The CCPP will have to pay the cost of the project and other expenses that may have been incurred so far.
Installation
The possibilities are: SATE system, ventilated façade or blown cavity insulation. Once the needs of the building have been assessed, and with the approval of the CCPP, the most suitable solution will be implemented, provided that it meets the maximum requirements for obtaining the subsidy.
Articles you may find interesting
We call you